MANILA, Philippines — The Energy Regulatory Commission (ERC) announced that it has issued the 2025 Amended Rules Enabling the Net-Metering Program for Renewable Energy.
The regulator said this development aimed to streamline the implementation of the net-metering program and make renewable energy (RE) adoption more accessible to qualified end-users.
Following a series of public consultations and careful review of stakeholders’ inputs, the ERC issued Resolution 15, Series of 2025, introducing key amendments aimed at strengthening consumer protection and simplifying processes for availing of the program.
As per the ERC, one of the key amendments permits the banking and rollover of net-metering credits toward a qualified end-user's electricity usage across current and future billing periods.
ERC amends net-metering rules to expand renewable energy options
It added that in the event of a property ownership change, the credits may be transferred to the new owner, subject to conditions such as a conforme letter from the original owner., This news data comes from:http://aichuwei.com
Net-metering allows customers of distribution utilities to install an on-site Renewable Energy (RE) facility not exceeding 100 kilowatts (kW) in capacity so they can generate electricity for their own use.

In turn, any electricity generated that is not consumed by the customer is automatically exported to the distribution utility's’s distribution system.
ERC amends net-metering rules to expand renewable energy options
- Alex Eala makes history With comeback victory at US Open
- Customs finds only 2 luxury cars at contractor's compound in Pasig
- Plea written in blood saves Chinese woman trapped in locked room
- ‘Lannie’ will bring rain showers, thunderstorms over North Luzon —Pagasa
- Xi slams 'bullying' in speech to regional leaders at summit
- Giovanni Lopez pledges to continue and expand DOTr reforms
- Open mic caught Xi, Putin discussing immortality
- Mexican drug lord faces life in prison after pleading guilty in US court
- House panel defers 2026 DPWH budget until agency submit changes
- North Korean leader inspects new missile factory ahead of visit to China